Thursday, 26 August 2010

Two weeks away


Well as they say time flies. Two weeks since my last post and those two weeks have literally flown by. I had to travel away with work, which has meant no modelling since my weeks hols. However, in the last few days of my holiday I managed to get the baseboards built for amberleigh and the fiddle yards, with the baseboards for the fiddle yars interchangeable with thoseof the Watergate Halt. I will put a post up soon of the track plan, etc on the new board.

Anyhow I returned from work to find a package from ten commandments with the station detailing kit and express models for the lighting kit for my bachmann class 08. These projects are going to have to wait a while as more weddings and weekend working mean that there is next to no modelling time available at the moment. I am hoping to buy a bachmann class 20 with dcc sound and a dynamis set, but both funds and time are short!!!!! As I do not have time to model at the moment I really can't justify the investment, but I am sorely tempted.......

As I was working away, the site i was working on in Suffolk had a small occupation level crossing, which you have to phone through to the signal box for permission to cross. As I stood there one morning the unmistakable noise of class 37s rumbled down the line and my collague (Martin Bates) took this shot as a double headed class 37 nuclear flask approached. I am sure it is perfect to model for prototypical class 37 operation.

Thursday, 12 August 2010

Mk1 finished


I had a full days modelling today and got a bit done! I have finished my Mk1 intercity RU (as photographed). I am pretty pleased with the result, although I might try George Dents tip of using T-cut on the next one. However, I am not sure how suitable this is for a non steam mark 1? The weathering of the Hornby Shark is coming on well, as is the painting of the first walrus wagon. I have spent most of the day building a second walrus wagon, and have built this slightly different to the first one, which I think has improved the build no end. I also recieved four wagons ECC wagons and two mark 1 coaches from hattons this morning, which are now on the end of my very long lists of modelling tasks! Tomorrow I hope to be able to finish the build of this Walrus and also possibly a Lamprey. When I get the build of the walrus finished I will put up a series of photos of this build. The building of the little station for Amberleigh is coming on well and I hope to get the baseboards built for this scenic plinth at the weekend

Wednesday, 11 August 2010

Walrus


Well time has literally flown by over the last two weeks. We went camping in north Cornwall for the week last week and have had friends over this weekend, meaning modelling time has been non-existant. However, I now have four whole days, non interupted, modelling time. I am going to build the boards for my test track (Amberleigh), which will act as the senic plinth for my blog. The baseboards for the fiddle yards will be inter-changable with the boards for Watergate Halt, so I will be well prepared for winter modelling.

On other things, I have primed the walrus pretty much, although painting it with primer by brush, means that a few bits are unprimed. The kit is a joy to build, although I think there are a few tweaks to the build that I think will improve the appearance of the wagon no end. I have purchased a second walrus kit and I am going to build this over the next few days and post onto my blog the construction of the kit.

The scuffing up of the RU MK1 is finished and I will post a picture of that on here tomorrow. I am also detailing a Hornby Shark Brakevan and will post a before and after on this. I have also purchased an Express Models lighting kit for my class 08, which is another detailing project to start. I am also going to start detailing my Heljan class 33/2 and finish the construction a couple of buildings for my scenic plinth. All in all I have lots on the go but am thoroughly enjoying my modelling, when I get time to do it!!

Tuesday, 3 August 2010

NSE class 108 finishd


Well another busy week has again left precious little time for modelling! However, I did manage to finished my NSE class 108 last week. I think that this upgrade has really improved the look of the unit and with the decoders added it runs just great. My biggest gripe, is that the bachmann decoders are too big and you can see the wires through the window. However, smaller decoders cost more generally.....
Anyhow, this project turned out nicely and has inspired me to press on with the construction of my DC kits class 119 DMU and to suitably detail the other Bachmann Class 108s I have. I have two weeks off work at the moment, but am off camping this week. So it will be next week that I have some time to get stuck into modellling again, and start building my scenic plinth (Amberleigh Halt) for photographs, as well as finish some of these other projects!!!

Tuesday, 27 July 2010

Amberleigh Halt



Well another weekend came and went, with much body boarding with my son, and no railway modelling! However, after deciding to make a senic plinth for photography on my blog, this developed into th idea of modelling a small station halt over the weekend. Literally 1 baseboard 2ft long, which can be connected to some pre-existing fiddle yard baseboards (or the ones that will be constructed for Watergate Halt). Building this plinth will give me some much needed experience of landscape modelling. I am currently building the Halt, which I am going to call Amberleigh Halt, from a Wills kit. I am going to add just a few basic senic details, such as pillbox, platelayers hut, and bridge, but it is essentially a small excerise in layout construction. I am really looking forward to developing this micro layout, no doubt with plenty of help from my son and girlfriend!!

Other projects are progressing slowly. The walrus wagon is almost primed (half done!!). I intend to put some photos up of this tomorrow night and write about tweaking the construction of this. I also am planning to build another straight away, whilst the details of the build are still in my head!! The NSE class 108 nears completion and Southern Pride FO plods on as ever, although I must confess I am rapidly losing interest in that project.

I have nearly finished the weathering on the Bachmann Intercity MK1 RBR. I took some photos of it tonight to identify any flaws in it, etc. It is starting to shape up, although a few more subtle pieces of weathering are required to finish. I have posted a couple of pictures of this ongoing project. I hope to finish this and few other projects this week. I am off on holiday next week, but the week after I hope to be able to build the baseboards for Amberleigh Halt and Watergate Halt.

Thursday, 22 July 2010

Flangeways mermaid



Well I have finally finished detailing and weathering the first of my two flangeways mermaid wagons. All that work to remove the floor and add the couplings, plus the underframe grime, with a light body dusting of dirt. For a simple wagon conversion it was very hard work, but I have to say I am pleased with the result. It definitely looks the part, but with the amount of work put in I could have just built one of the excellent cambrian kits, which is what I shall do next time!!

With hindsight I am now not so sure it was worth removing the floor, however the whole wagon does look better for it. Problem is, as you can see on these photographs, you can barely tell. The second of these wagons is now on my desk, so I might undertake a conversion for couplings, etc, but leave the floor in place for a comparison.

Other projects are progressing well. The Southern Pride FO had the roof fixed on this evening. Just a few details left to glue on this one and then some painting and it will be finished. The NSE class 108 had cables added tonight, a few other bits need putting on, and the underframe detailing, but this is also going to be completed next week. The bridge and the concrete lineside hut are also part painted, and again I would hope to get these finished soon. I must get that lighting kit ordered for my class 08 shunter from Express Models, so I can start that in the next few weeks.

Lastly, I intend to make a short senic plinth for photographs for my blog, as I realise how awful my partly finished railway/work bench looks!! This is going to be built over the next month, so I can produce some higher quality photographs. Also a week off work in August is going to suffice for the construction of a mini-layout/test track. The first boards of WaterGate Halt will be built, ready for some senic detailing by myself, son and girlfriend over those long winter months!!!

DMu's



Last night I finished the first car of the two car DMU detailing project I am undertaking. With the new Craftsman detailing parts added and the decoder installed this car now looks the part. I have yet to fully tackle the second of the two cars, but this is on my desk for this evening maybe. The roof was painted in roof dirt and then gently weathered with powders. The underframe details were picked in out in various weathering shades and cables were added to the front. All in all I am very pleased with how this car turned out, it is such a pity that you can see the central mountng block for the motor through the windows though. I guess that is the price you pay for smooth running qualities.

I have finally finished detailing the flangeways mermaid, couplings changed and ready to go, all weathered. This has definitely been a long job and I am not sure I can face undertake detailing the second one. I will post some pictures of this tonight on my blog.