A happy Christmas to everyone!
Saturday, 24 December 2022
Sunday, 18 December 2022
Superstrip 2 - revisiting some old wagons
Wednesday, 7 December 2022
A continuous run in OO gauge - Pottington Quay refurb!
I have not had much time for modelling recently and had a spell of a few weeks away from home. During this time I was mulling over various modelling projects. I have been a bit frustrated with the lack of train running recently as the O gauge layout develops, and I have a lot of very good OO gauge rolling stock just sitting around in boxes. Putting all these things together - I made the decision to make a continuous run OO gauge, using the Pottington Quay baseboard as the scenic section as soon as I got home. My logic for this was:
1. I already had the baseboards necessary to complete a continuous run.
2. I did not need to finish detailing the layout - I just needed a continuous run - to stop the rolling stock (especially the sound chipped) locomotives from seizing up.
3. Having a working OO gauge layout will hopefully inspire me to get the Pottington layout finished - although this can be done at a meandering pace.
4. I have gathered a lot of the materials to get this layout operational over the year - so it is probably time to make a start.
So Pottington Quay needs a complete rewire, all the trackwork replaced and all the point motors replaced. My layout building skills have come a long way from this earlier attempt - and there is nothing for it but to rip it all up and start again. So yesterday I ordered all the track I need to make at least one continuous loop with the points needed for further extension. The original track on Pottington Quay was taken up - and this will be recycled into the fiddle yard and the cork underlay was arduously scraped up.
The jobs for this week are to build the curved baseboards (Tim Horn) and construct the straight fiddle yard to finish the continuous run circuit. I reckon with a bit of imaginative point laying I can accommodate a western or warship with 6 mk1 coaches in the 'offscene' run around - which will be far too long for the layout - but it will definitely be fun to sit down and watch with a beer in hand
Sunday, 6 November 2022
O gauge Pipe wagon finished
Recently I managed to finish off the Parskide O gauge pipe wagon. I am really enjoying building wagons in O gauge, but it does take a long time to get anything finished(!) - so it is great I have another wagon ready to roll on the layout.
The kit is built as per the instructions and is painted with Railmatch enamels and finished with Railtec transfers. I also took some time to produce a detailed wood interior for the wagon and I am reasonably happy with how that turned out.
Overall, another wagon ready to roll on the layout. However, the layout as such has seen no progress since September. At the end of November I am hoping to set the layout up and really attack some of the detailing - I have the backscenes ready to go and am hopeful I can really push on with getting the layout towards a finished state.
Saturday, 22 October 2022
Slaters Vanwide and a bit of layout progress
Updates on this blog have been a little sparse this year - it has all been a little hectic! We are already one house move down this year and are just going through buying our forever home. Optimistically we will be in by Xmas, but this coupled with some hideous deadlines at work, has meant that there has been precious little modelling time available. Hopefully this will improve after November, but until then the best I can hope for is the odd evening of wagon building. However, it is not all doom and gloom on the modelling front. Focusing on wagon building has meant I have finally got some wagons finished off. The Slaters vanwide build is now complete!
My first Slaters wagon took about 4 years to build, the second one took a year and the vanwide took about 6 months! Now I have got then hang of building the Slaters kits, I am optimistic I can pick up the progress with building some wagons for the layout. I have just started building a Slaters conflat and I have picked up the Parkside SR brake Vvn that I started about 9 years ago (it is frightening how much time has passed!). I have plenty of kits currently in the pile and am looking to build 3 or 4 milk tankers and some parcels stock over the next year. In other modelling, the ballasting has been started on the layout, although unfortunately, this has stopped pat way through and the layout has been packed down. I just do not have enough time to spend on the layout at the moment and I am waiting until Christmas when I can get the layout set up to do some serious detailing. I have the backscenes all ready to fit, so I am just waiting for some time to finish ballasting, add in the backscenes and start the scenery in earnest.
Saturday, 20 August 2022
More O Gauge progress and a finished BR 12t Plywood Van
I have made some more headway on various O gauge projects over the last few weeks, although modelling time is at a premium (why do I always end up saying this!). The layout continues to edge forwards, with the quay wall all scribed and the dry brushing started. I have made some platforms for the hand operated point levers and with the track painted, I am going to start ballasting this week, once the point levers are installed.
The trackwork has all been tested over the last couple of weeks, trundling a class 08 up and down the layout and it all seems to work pretty well. I am going to get the Heljan class 03 sound chipped this weekend for a test run. The 0-6-0 wheel arrangements are relatively inflexible and some of the curves on the layout are pretty tight. So I just need to check that everything works OK before committing to the ballasting. I am certainly looking forwards to having a sound chipped locomotive to play with - having got rid of my OO gauge layout, where all the diesels were sound chipped, running trains without sounds now feels a little one dimensional.
I have also managed to finish off adding a bit of life to a rtr Dapol 12T plywood box van. This van had some details picked out on the underframe alongside some body weathering, via the airbrush and railmatch enamels. It is quite a good model and I am pleased with the finish on it. So now I have four whole wagons ready to use on the layout! I also have a slaters 12t van nearly finished, it just needs a solebar to be replaced and the painting finished, whilst a vanwide has sat on the modelling desk for about 3 months waiting to be finished. In my opinion, this is the most pleasing aspect about modelling in O gauge; each piece of rolling stock takes quite a long time to build and detail, and they are reasonably expensive. Therefore, I do not have masses of stock, but I am slowly taking my time to build everything. This is proving to be a lot of fun and I am now settled on this way of modelling, certainly for the near future. I am keeping all the OO gauge stuff I have detailed, but I selling off a lot of the OO gauge stock I acquired but never got around to using; which has provided some funds for my O gauge adventures. In some ways it feels like a relief to get rid of clutter and old models that I never got around to using.
Saturday, 23 July 2022
O gauge wagons: A vanwide, 13t open wagon, pipe wagon and pill box brake van
Recently the building of both the OO and O gauge layouts has been slow. The weather has been glorious, we have had people to stay and there has not been enough time or space to set up the layouts to work on them. So the small bits of time I have had for modelling I have been focusing on building some wagons for the O gauge layout. In reality the O gauge layout is miles away from being usable; I only have two wagons finished, no locomotives finished and only non detailed rtr coaches. So there is very little useable stock for the layout, coupled with the detailing on the layout being in a very basic state. However, the joy of O gauge is certainly building the rolling stock, in my case very slowly. It is a very satisfying way to model.
So first off I managed to finish the Slaters 13t open wagon. This is my first finished Slaters kit and I think I have now cracked the basic Slaters design. I am hopeful I can finish off some the other Slaters kits I have much more quickly now. The wagon is painted using the air brush with Railmatch enamels and uses Railtec transfers.
Next up is Parkside pipe wagon. This wagon I had built years ago and completely forgotten about. I found it in a box when we clearing out our storage unit. So this is now in the paintshop, again being painted with the air brush and Railmatch enamels. It is pretty much ready for transfers now and a bit more weathering.
I have also picked up a Pill Box brake van I started building in 2014; this build had stalled and I had lost the instructions. However, I now have a fresh set of instructions and am looking to complete this wagon over the next week and get it into the paintshop.
The main wagon I am currently building is the Slaters Vanwide kit; this kit is a little fiddly, although it is shaping up nicely. I am planning a modelling day tomorrow and I aim to complete this build tomorrow. This one has only be under way four months or so - so a speedy build!!!
So some slow but continual progress. I have been thinking about the sort of trains I want to run on the layout and it will involve a lot of kit building. A small parcels train, a milk train and a fertiliser train using 12t vans, will require something about 12 wagons to be built. I also plan to build some engineering wagons - so it is going to be quite a lengthy process. However, I am enjoying the planning of the trains I am going to run and the building of kits - it is great to not be overwhelmed by having too much rolling stock. The next wagons in the line to start are a Slaters milk tanker, a CCT and another SPV. So plenty to do and plenty of enjoyment being had!