Sunday, 31 December 2023
End of 2023 and back to modelling in 2024
Sunday, 24 December 2023
Happy Xmas Everyone!
Modelling has been pretty quiet for me over the last 6 months - hence the lack of updates! We have been busy renovating our house - and there is light at the end of the tunnel. I should be able to get my airbrush up and running again over xmas - ready for the new year. I am also optimistic of a little modelling time over the Xmas hols.
However, until then - I hope everyone has a very merry xmas and lots of train shaped presents!
Saturday, 15 July 2023
O Gauge Layout progress.....
I have been a bit quiet on updating my blog recently, due to a variety of reasons. There is a lot of renovating on the house going on and this will continue for most of the summer, coupled with a change in my professional life. This is all great news, as come winter I should have plenty of modelling time, which I am really looking forward too. I have numerous kits stashed away to build and a number of locomotives that I really need to get around to detailing, however, I never have enough time! So from November onwards the house will be largely finished and my work commitments will be significantly reduced, freeing up a lot of time to do other things in life. We are about to knock out what is left of the kitchen, rip up the lounge and replace the diner and bathroom. However, before this all begins (and the mess that goes with it!) - I set up the layout in the lounge to really push forward on some of the detailing aspects. There were lots of little niggly thing I just needed to get sorted out before I pressed on with adding some of the detailing elements.
So to start with the ballasting is all but finished (I have a couple of bits to tidy up today). It was a longish job, but a little bit each evening soon saw completed. I took the opportunity to rectify a few areas of poorly running track in a couple of places whilst gluing in the ballast and everything now runs as it should - fantastic! The points are all free and I cleaned the track and test ran a few locomotives..... The Heljan class 03 was running like a bag of old spanners, so I gave the wheels a good clean and popped it on the track - it spluttered than ran straight off the baseboard onto the hard wooden floor. The class 03 It is a bit of mess now - so there will be a complete rebuild of this locomotive over summer - a very expensive mistake that one.
I had also been dithering about the tunnel and had made no progress with this. I completed a tunnel mouth last summer, but it is very big. However, I have now decided to bite the bullet and use this - so this has been glued in place. It will need the scenery building up around it when I add in the backscene, but this can be dealt with, when the house renovations are complete. It just about fits across the baseboard - but it is a tight squeeze.
On the quay side I have been building up the water level using coats of PVA glue - this is an attempt to even out what had become a very rough surface and provide a rippling effect for the application of some water gel. This has been largely successful, although there is more to go here, finishing this off. I will get one more coat of PVA on it today, alongside adding in some wooden posts on the quay side. These have been made and will be glued into place later today.
Lastly, the buildings for the layout really needed some progress. I recently completed the pub and have made a lot of progress on finishing off the dairy office. I have added the interior detail, popped in some lights, and added the roof. It is now just a question of a little more detailing of the doors and gluing these into place, adding some lead flashing to the roof, then weathering the down the tiles and finishing the guttering. This will be a job for over summer, when I can snatch a moment of modelling time in the evening.
So plenty of layout progress, even if it has been in fit and starts; I can now finally see this all coming together. Tomorrow morning I am packing down the layout for the next 2 months or so, whilst we move through the real life house building projects. In the mean time, I intend to build a couple of wagons and continue with the finishing/detailing of the buildings. I also have the Class 03 to rebuild and weather, alongside detailing the Dapol Class 122. In addition, the Class 25 just needs reassembling, then I can start on the detailing of the next locomotive. I have a Hymek, Warship and Western sat in my modelling boxes. It is really fantastic to now have an operational layout, although ideally I also need to get the fiddle yard sorted - being O gauge this will need to be a traverser, as handling these O gauge trains is somewhat tricky. However, I can see that by Christmas, I will have a layout that is largely finished, with a handful of O gauge trains detailed and some kit built rolling stock finished to play with - happy days!
Friday, 16 June 2023
An O gauge Pub and a start on the dairy buildings
Recently I have decided to finish off a number of projects that were started a while ago, but have subsequently sat around. I am hoping that over summer I can get the layout set up properly and finally finish the ballasting, add in the backscene and do a lot of the detailing projects, i.e. have a usable model railway. Right now, the O gauge layout has stalled somewhat, after moving house and having to install a new kitchen/diner, etc. When I finally get around to setting up the layout, I want to be able to add in some of the buildings and then move relatively quickly into adding small details/scenery around the layout. So to be able to do that I need to get cracking with finishing off some of the buildings.
Finally finished the pub - now I just need to set it within a 'scene' on the layout.
The pub has been an ongoing project, having been close to finished for a while. Some final bits and bobs needed to be added, such as a few piece of guttering and a bit of painting here and there. The basis for the model is a Petite Properties kit and this was first my attempt at producing a model building like this. I have learnt quite a bit from doing it, especially that sanding down Polyfilla goes everywhere! However, it has turned out OK and I can see how I can improve the overall finish on subsequent models. I have installed some lights in the pub and it has a fitted interior. Modelling in O gauge does provide the opportunity to install lights/interiors as features of model buildings and quite a few of the buildings will have lighting installed.
With the pub finished I am now detailing one of the dairy buildings and make a proper start on painting the Quay masters cottage. After this I have the second dairy building to do, that will sit on the top of the dairy platform at the end of the layout. If I can get these bits knocked off in the next few weeks then I can really make a start with some of the basic detailing elements over the summer (once the kitchen has been installed anyhow!). The other big job, is to sort out a tunnel exit - I have now purchased two tunnel kits and neither of them fit the bill, so I am just going to have a go at scratch building something - fingers crossed. I need something smaller for the end of the layout - as the purchased tunnels are just too wide. The other thing I am planning to do relatively soon is install the water scene on the quay - I am going to buy some AK interactive water gel and give this a try - although I plan to do some experimenting first.....
Friday, 2 June 2023
Another O gauge wagon - Slaters 12T standard van
Who knows where the time has gone in the last few months - life has been really busy and modelling time has been somewhat limited. The little modelling time I have had, has been spent building some wagons very slowly in the evenings and the odd spray painting session with the airbrush. I currently have a couple of wagons nearly built in O and OO gauge, and a couple of O gauge wagons nearing completion in the paint box. My biggest challenge right now is to focus on the finishing of some ongoing projects on the O gauge layout, particularly some rolling stock, alongside finishing off some of the basic scenery detailing and buildings. I have far too many projects half finished and I would like to move at least some of these to the finished pile.
One project that has been ticked off and is now finished is a Slaters 12T box van. My first Slaters kit took me about 6 years to get around to finishing. This 12T van was the second one I did, started in 2020, so a mere 3 years later it is finished. Undoubtedly, I have now become more used to Slaters kits and can get a really good build from them - they are great kits, but they do require a bit of time and patience. This van was painted with Railmatch paints via the airbrush and had Railtec transfers applied. All good and another one finished for the layout. The next one of these I do, I will be a little more adventurous with the painting of the body, adding some in some different coloured planking, however for now this finish is fine.
The layout has made slow (non) progress in recent months, with only a little ballasting being finished. I am still mulling over the tunnel exit and likewise the landscaping at the end of the layout. This all needs a little more thinking about, so next steps are to finish the ballasting nd get the tunnel mouth and embankment at the end of the layout sorted. Once this is done, I can get the backscene in and really start cracking on with the detailing.
Wednesday, 19 April 2023
Heljan O gauge class 25 - dcc sound - nearing completion
This week I managed to sit down and tackle the install of the class 25 ESU Loksound XL decoder into the class 25. This locomotive has been sat in the paint boxes since last summer, but over the last couple of months I have made a concerted effort to move this model towards completion. One of the big stumbling blocks was the fitting of the DCC sound chip - in OO gauge this is the most simple of tasks - take off the backing plate and put the new chip in - solder up a speaker and you are good to go. In O gauge this was a slightly more daunting task.
The class 25 from Heljan has come in for loads of criticism on internet forums - mainly to do with a perceived error in the cab end. When I got my version (about 6 years ago now) I was worried that the model was inaccurate (O gauge locomotives are not cheap!) - however, since taking it all apart I think it is a cracking model. A bit of detailing on the body and the model really comes to life. So progress so far has been to spray and then varnish the body shell - this weathering was applied on top of the BR blue factory finish, using streaks of faded blue, before building up the weathering coats. I found the glazing a nightmare to get out, so I ended up leaving some of it in place - however before I finished varnishing I removed the masking from the glazing - to blend the model together. This was a big mistake, as the glazing reacted with the thinners in the varnish and clouded over - I have tried to correct this with a little acrylic varnish, which has been partially successful - I guess it is all learning! The glazing now looks OK - although the original glue used by Heljan for the glazing is noticeable on the factory finished model (see above). Likewise, the underframe had the bogies removed and was weathered separately to the bogies before reassembly.
With the body only now needing the final reassembly (a job for later this week/next week) I managed to fit the DCC sound chip yesterday. Not knowing what I was doing meant that it was quite a long job. In the end through it all works - I wired in the track feeds and the motor connections first. After this I added the headlights to the front light / rear light terminals, whilst putting the tail lights on the Aux1 and Aux2. All the lights on the Heljan locomotive work through a common positive and these were all wired through U+, via a 10KOhm resistor. It took some time to get it done - whilst watching some You Tube tutorials (thank god for Hither Green!) - as I had to work out quite what I was doing alongside testing it as I went. Of course the biggest concern was getting it wrong the blowing the chip up - luckily this did not happen!!
So jobs for this week are to reassemble the body shell by adding in the glazing, put the roof fan back (it is now non motorised), put on the headcodes (Railtec) and then finally reattach to the chassis. The underframe needs the DCC chip secured alongside making a small plasticard cradle for the speaker, which will then be glued to the chassis block. Fingers crossed that it should not take too long to achieve this and then hopefully I will have finished my first O gauge locomotive. Lots of lessons learnt about how to handle O gauge locomotives whilst weathering them, removing glazing, masking, installing the DCC chip after removing the PCB board - so hopefully this will stand me in good stead fr future projects.
Friday, 7 April 2023
An O gauge Heljan catfish wagon and some other bits and bobs!
We are still bedding into the new place, with plenty of work to do on the house. However, the really crazy time of moving and unpacking has largely subsided and I have had more free time to model in the evenings. I have also had the airbrush up and running and managed to do some painting - this has certainly helped gain some momentum with a few projects. Having taken stock of what projects I currently have on the go, I decided I really needed to focus on a few projects t get them over the line. So this weekend is going to be dedicated to finishing a few items of rolling stock and buildings for the O gauge layout, which I can hopefully set up next weekend for some detailing.
So the first project I finished this week is some pretty standard weathering of a Heljan catfish wagon. This wagon is in olive green livery and served as a test bed for weathering/detailing rtr stock in O gauge, alongside the Dapol fruit van I recently finished. The weathering was pretty simply applied, being two shades of rust, followed by various shades of sleeper grime, weathered black and frame dirt, etc. It was all done via an airbrush using Railmatch enamels. I feel reasonably happy with it, although the final finish could have been further developed, such as fading out the olive livery, etc. I have another Heljan dogfish to weather soon, and have ordered a sealion wagon and shark brake van - so the engineering O gauge train is slowly taking shape. There are some other wagons to add to this mix, such as a lowmac, various spoil wagons and probably another dogfish, but these kits are yet to be purchased or built!
Other projects in the paint box include a nearly finished class 25 - which just needs two more coats of varnish and then it is ready for reassembly/dcc fitting, plus a 12t box van ready for transfers. So hopefully there are a couple of other projects I can finish over the weekend. On the modelling desk is a partially constructed Slaters lowfit wagon and I have made a very slow start on the first of the O gauge milk tankers, which I am really looking forward to constructing. Finally the O gauge buildings of the pub, dairy office and quay masters cottage really need to be finished off, so this week I am going to spend some time on getting them done to. Plenty to be getting on with anyhow and a little bit of free time to spend on these projects!
Sunday, 26 March 2023
Slaters O Gauge Conflat
Well the last few years have been pretty hectic with moving around - we have moved again and it is our 3rd home in 3 years. However - the best news is - this is our forever home - or at least our very, very long term home. The bad news about this move is that - my time has been sucked away into house repairs almost continually! This has left little time for modelling. The other very bad news about the house move from a modelling perspective, is that although I have lots of opportunity for a modelling room - I do not currently have a room where I can operate my layouts. This is limiting layout progress, so I am currently focusing on building some wagons.
Alongside the Conflat A/Lowfit I have been tinkering with a Parkside Fruit D in OO gauge. This will be onw of the final wagons to go in my engineering olive green train. It is interesting how small I am finding the OO gauge wagons now - they are tiny in comparison to the O gauge stuff. I think that once I have finished the detailing on Pottington Quay - I might solely focus on O gauge - as I am finding it a much more enjoyable scale to model in. However - I will keep the Pottington Quay layout for running trains in OO gage as I have previously finished off so many trains and kits! There has also been a little painting going on recently - the O gauge class 25 is nearly completion, amongst other projects - so some little slow, but steady progress.
Monday, 2 January 2023
Pottington Quay - the new layout and a modelling new year!
I hope everybody has had a fantastic xmas and I wish you all well for the new year. Over the xmas period, alongside eating way to much and doing a lot of great walking, I have made a lot of progress on the Pottington Quay OO gauge layout, amongst other modelling projects.
I initially spent some time building the curved baseboards that I ordered from Tim Horn last year (obviously they were awesome and went together like a dream). After this, I aligned the curved boards to the pre-existing Pottington Quay scenic board and built a simple straight fiddle yard board (Tim Horn again). I then laid and soldered the track down for a continuous run. This was a pretty simple wire up and three points have been installed on the fiddle yard and one on the scenic section. These are now ready to lay down the track for the fiddle yard sidings and quay front, but I did not manage to get that far over the xmas holiday. What has been awesome was to plug in the NCE powercab and just run some trains on the loop - it is amazing how different it is to operate the trains on the continuous run instead of the terminus to fiddle yard as per the Charlton layout. For a start - many of the trains had a much lower top speed than I anticipated. Secondly, the way you have to drive the trains is quite different, notching up and then easing the power off - all good fun - but it will take some time to learn how to operate it all properly.
Alongside building the OO gauge layout, I have paint stripped the O Gauge SPV and Dapol milk tanker (that is another blog post in its own right) and I also stripped the paint on an OO gauge CCT and PMV. These are all now pretty cleaned up, partially rebuilt and are now ready for re-entering the paintshop. The platform has also been rebuilt on Pottington Quay and likewise this now needs some repainting.