Pages

Tuesday, 25 December 2018

A Merry Christmas

A Merry Christmas to one and all!

I hope to get back to some regular blog updates next year.  The last couple of months have been too hectic to achieve any modelling.  However, you never know what Santa might have got me this year.....

Saturday, 27 October 2018

Class 45 Howes DCC sound - speaker replacement

As part of the updating of the DCC sound for Charlton, I fitted a new speaker into the Class 45.  This was the first locomotive I tried to put a chip into, and I used the small round speaker supplied with the Loksound decoder. I had never been happy with the sound quality on this locomotive, so I replaced the original speaker with a much better ESU 20x40mm speaker.  The difference is quite startling and certainly less tinny.  I have now settled on using either iphone speakers or the ESU 20x40mm speakers on all the locomotives.

Class 45 at Charlton station.

Original speaker.

New speaker.

The use of better quality speakers and running multiple trains together, means that difference in the volume of different locomotive has become quite apparent.  As a consequence, I have been playing with adjusting the master sound levels on the decoder, programming them using my NEC Powercab.  I am now getting to a point where one locomotive does not completely dominate the others.  What is also very noticeable, is that running in a train that is not sound fitted, after using several sound fitted locomotives, the non-sound fitted locomotive is very one dimensional in comparison.  So from now on, I am only going to use sound fitted locomotives on the layout.  I only need a maximum of four locomotives plus a DMU to operate the layout, so this is quite achievable.  I plan to fit sound to a number of locomotives over the next few months, for key classes suitable to North Devon, such as a warship and a Hymek.

Class 45 running around its train.

Leading an engineers train out of the sidings, back towards Barnstaple.

On other project fronts, the class 31 has had the Hornby TTS chip removed and this has been replaced with a Howes sound decoder - this now drives and sounds like a dream.  The class 122 is nearing completion out of the workshop, although my air compressor has broken recently, and is providing irregular spray patterns - which has held up the class 122 dmu. This has the added complication of poor quality spray finishes on some of my projects, which will need to be remedied when a new compressor arrives.  Until then, there is always more detailing to go on the layout - the car park has been added to the layout and this requires finishing off and detailing - especially the addition of a fence which has made absolutely zero progress.  I have ordered a few trees for behind the station and the station lights still require being added.  Although these details still require sorting out, especially the station lights, I am confident that with a couple of days modelling I will be able to finish these projects.  So I am happy to start looking for exhibitions to take the layout too.  Problem is I have no idea how to obtain invites for shows.  I would like to start early next year exhibiting the layout so any recommendations on how I would achieve this would be most welcome!!

Sunday, 21 October 2018

Layout detailing and Dapol paint woes

The layout has continued to make some slow but steady progress, with the fence along the back scene being joined up to the tunnel mouth.  This area has had some details added to it, such as some scrap outside the signal box, having been left from the rationlisation and closing down of the signal box.  The air of the station is intended to be something that is run down post Beaching, but somehow manages to cling on and not be shut down by BR, although it is now the terminus of a truncated branch.

The area of detailing behind the signal box, on the way to the fiddle yard.

More weeds growing along the railway wall.

Slightly elevated view showing the fence and tunnel.  The car park will be to the right of the office block.

Aerial shot showing the detailing at the end of the layout.  There is more to do, but it is coming along.

This area of the layout is now heading towards completion, although there are a couple of jobs to finish, which is the building of an interior for the office block and adding a car park and fence here.  The car park is a sheet of plasticard that is currently in the paintshop, but the office interior and fence are yet to be started.  Some more trees are also needed to sit behind the station and also on top of the tunnel, just to blend these ares a little into the backscene.  The other really important task is to fit lights to the station and glue down the station building with some signage added.  These are all relatively small jobs, but they all take time.

In terms of rolling stock, I intend to run two DMU services on Charlton, one being a BR blue 122 and the other a BR blue 108.  I made a start on detailing the Dapol class 122, with the standard first step in the weathering being an all over body wash of grime, wiping most of this away with a cotton bud dipped in white spirit.  The results of this on the Dapol 122 (and also a class 22 I am doing at the same time) were a disaster.  Either the white spirit or the enamel thinner attacked the Dapol paint finish and I was left with a body shell that is best described as a bit pickled.  I am currently trying to rescue this paint job with an airbrush, blending in some weathered BR blue. The end result will be a DMU that will carry more grime than I was originally intending.  Reading on the web I am surprised that no-one else has mentioned anything similar.

This is how the Dapol paint looked after applying a weathering wash.

I am now desperately trying to fix this with the airbrush, blending in this paint.

So to keep me sane I have also spent a little bit of time running trains recently. Keeping the layout moving and operational helps me to find a little bit of inspiration to finish the layout detailing - when motivation is a little on the low side.  So a class 25 backing onto its train and about to depart on the 18:25 to Barnstaple Jn and on to Exeter, sometime in the late 1970s.

Class 25 backing on its train.

And heading back to Barnstaple Jn, and Exeter.


Wednesday, 10 October 2018

Some Charlton detailing: a Yard lamp and office building, plus station signs.....

So a little bit more progress has been made on the layout over the weekend, with the addition of a couple of working lights.  I am getting close to finishing off the scenic side of the layout and wanted a couple of working lights on each of the main boards.  This does present a little bit of a problem, as the boards need to be separated when dismantling the layout and I do not want further wires to have to be placed across the boards when I set the layout up each time.

The new lights in the fertiliser office and outside the provender store.

So I decided to place a small battery pack under each of the main boards, from which several lights can be run.  Given that the lights are only using small leds, the batteries should last for a very long time.  I glued the first battery pack to the underside of the board and wired it up to some lights.  The first is a small yard lamp and the second is part of an Express Models lighting strip, placed into the interior of a the small office next to the provender store.  Both these lighting units work happily off the 6v supplied by the batteries.  

The new office block with the lights switched on- this definitely requires an interior.

The office block is a ready to plonk Bachmann building, which I think works nicely in the small space provided.  Originally I was scratchbuilding a warehouse, but to be frank this had got nowhere over several months.  The office block will be used by the fertiliser distribution company, with fertiliser being unloaded at the provender store or on the adjacent area of cobbles.  

The office block is set into the cobbles and requires a little bit of work to blend it in properly.

Some other small detailing work was also carried out over the weekend.  The station has had some signs added, although I am not sure if I am happy with them.  The signs were purchased on line, allowing the individual station name to be presented, but they have a very glossy finish.  They have been mounted on some concrete station boards and placed on the station, in some pre-drilled holes, although not glued down for the time being.  I am going to wait a while to see if they start to bug me or not before gluing them down.

View across the station, with a new track side fence added and station signs evident.  The first tress have been added behind the station.

One of the new station signs, although I am not sure if I like the glossy finish....

The tunnel at the end of the layout has also had some static grass added.  The covering is currently a bit uneven, due to the corner of the layout being difficult to work in, especially with the static grass sieve.  Some detailing and tidying up needs to happen at this end of the layout, with the addition of some bushes and some hedges.  Lastly, the concrete fence has been finished, joining up to the tunnel, running along the backscene.  Some clutter has been added to the layout here, imagining some of the dismantling that took place as part of the Beaching cuts, although the station itself survives.

The Barnstaple end of the layout, with the tunnel starting to come together and and some clutter added to the permanant way.

So more scenery work to go, but also some more steps towards completion.  I need to add a car park this weekend, next to the office block, and add some bushes to the tunnel. There are also some trees to add along the backscene behind the station, to fill out the scene a little.  However, all in all, it is heading in the right direction I think!

Thursday, 4 October 2018

Iphone speakers and DCC sound

A few posts ago I decided to experiment with some speakers for my sound fitted locomotives.  Both the Class 45 and Western had smaller speakers, both of which I had become increasingly irritated with the sound quality on.  Both speakers produced quite tinny sounds and were quite trebly in the sound they produced.  So after a bit of web googling I opted to buy a couple of small double Iphone 6 speakers from Roads and Rails.  This evening I swapped over the smaller rectangular speaker in the Western for comparison.  The difference is quite outstanding, although on the videos, it is less noticeably.  The biggest difference is the base end of the sound, which is now far more distinct.  The general sound functions are hugely improved. The swap over took 30 mins but has increased the sound reproduction no end.  The lesson, use a higher quality speaker in the locomotive!  By the time you fit a sound decoder in a locomotive, you are looking at a £200 locomotive.  The speaker is a relatively cheap part and one that will improve your enjoyment of using the locomotive no end.  Another job for the weekend now is to change the speaker in the class 45....

Start up old speaker

Start up new speaker

Running old speaker

Running new speaker

Sunday, 30 September 2018

BR mk1 coach lights part three......

Some seven years ago I ordered two Express Models lighting kits for BR mk1 coaches, being a BCK and SK.  In 2011 I finished the BCK (see here http://choppersrailway.blogspot.com/2011/06/bck-coach-lighting-ptii-vanfit-and-some.html); well seven years later I have finished the SK!  It is somewhat frightening how much time has passed since then!  I now have a finished, fully lit short rake of coaches for operation on Charlton.

Finished mk1 SK coupled up to the BCK.  The effect of the ligting is clearly visible in this picture.

Again the effect of the lights at dusk are clearly visible, coupled up to a western, ready to leave towards Barnstaple.

The first thing to do was take the coach apart and remove the glazing, separating the roof from the coach sides.  The bogies, underframe and roof were all weathered with an airbrush separately, whist the coach sides were treated to a wash of weathered black and frame dirt, with the majority of the paint being wiped off. The interior needs a c. 5mm reduction in height, achieved using a dremmel, to allow accommodation of the lighting unit.  Once this was tested for a good fit, the interior had the seats painted and some passengers added.

The coach which has been taken apart ready to start.

The various components ready for reassembly; note the painted seats and passengers added.

The glazing was then glued back to the coach sides and the sides were glued back onto the roof, with some plastic strip added to the gap between the two.  This join was filled with glue and glaze, and after it had set, it was painted weathered black.  This stops light bleed between the coach sides and the roof.  The coach was then reassembled and some blending together of the underframe and coach sides was achieved using the airbrush.  The bogies were then screwed back into place, with the picks up soldered onto the brass strips, to collect current from the coach wheels.

The join between the roof and the sides has had some plastic strip glued into it, then filled with glue and glaze before painting black to seal the join.

The fit of the lighting unit, with the interior cut down to accommodate the unit.

This has been a really good project and one that moved through to completion reasonably quickly.  The connector between the two coaches uses the Bachmann coach pipes which fits into the nem socket.  The end of each coach has a 3 link coupling added, to make it compatible with my rolling stock.  I have read several internet forums that say not to use 3 link couplings on coaching stock, due to the problem of uncoupling from the locomotive.  I have not found this to be the case, although of course sometimes it takes a couple of efforts.  However, different locomotives are easier to use.  The western coupling is easily accessible, whilst the class 45 coupling is very difficult.  However, it is essential to couple from the coach to the locomotive, as it is nigh on impossible to couple from the locomotive onto the coach under the end connector.

Ready to head back to Barnstaple.

The Express models lighting kits are very good, although they are quite expensive.  I have a further one to fit to a BSK.  However, I recently saw a thread using lighting kits for MK1 stock from 'layouts 4 u', which are under half the price, including an anti flicker unit.  So I have ordered a couple of these.  I would like a 3 coach rake to operate Charlton at exhibitions, although the 2 coach rake makes the payout fully operational now with 1 passenger train. It is great to have proper coach lights to complement the sound and lights of the locomotives.  I just need to get a move on with finishing this layout!

Sunday, 23 September 2018

Charlton - further progress and some train running

Another stint of away working had disrupted the push towards finishing Charlton.  Whilst the whole layout is now operational, there is a lot of detailing work to still be done.  The layout had been put away for a couple of weeks, so this weekend I put it up in the living room and set about running some trains - in order to find a little bit of inspiration for a final push.  There are multiple jobs to complete on the layout, each of which takes a little time, so it can feel that progress can be a little slow.  However, I have finished adding lights into the SK coach, meaning I know have one fixed rake of coaches to use as a passenger service.  

Short rake of MK1s with lighting completed ready for use on the layout.

The class 45 runs the early morning passenger service into Charlton - the effect of the coach lighting is clearly visible in this video.


Class 31 shunting some goods wagons around the fertiliser store ready for off loading.

I loaded up the fiddle yard with a passenger service, a parcels train, a small fertiliser goods train for the provender store and an ECC china clay working. These are the general formations that will operate the layout, with the only addition to this being a DMU.  It was great to get a feel for how the layout operates and the sequence of arrival and departure of trains.  In the main the simple track plan works well, although it is slightly intensive using the 3 link couplings on each train, especially under the coaching stock. 

Class 31 ready to drop the emptied wagons into the siding.

A class 25 has collected some ECC wagons from the local quarry and collected the empty fertiliser wagons, now ready to head back to Barnstaple.

A western runs round its train and is ready to head the service back to Exeter St Davids.

Playing around with the layout has meant that it has been possible to compare the DCC sound outputs of several locomotives running on the layout at once.  What is quite clear with these locomotives running around, is that there is a large difference in the sound outputs from the locomotives, both in volume and in quality.  These locomotives have been sound fitted by myself and have used different speakers - and the end result is some variation in sound output.  I am now going to do some more serious experimentation with speakers in an attempt to improve the sound quality of the locomotives.  I have ordered some iphone speakers and will look to replace the speakers in the Class 45 and Western over the coming weeks.  However, a fleet of 3 sound fitted locomotives plus a DMU are more than enough to make the layout fully operational.  So some focus on finishing off enough trains to make the layout work is in order, with a class 22, a class 25, a class 42 and class 52 the chosen locomotives to operate the sequence, at least initially.

Parcels train heads into Charlton.

A western departs back to Exeter, via Barnstaple jn.

So lastly, back to the layout, an office block has been purchased to place alongside the provender store.  I am currently painting a fence for this.  I need a fence along the front of the layout too.  Another fence is needed to join the tunnel to the main layout board, and this too has been constructed.  So lots of painting of these now, to move these ares through to completion.  The station also needs detailing, and I have started painting up some station signs to finish off this area too.  So some glacial progress, but progress none the less. 

A class 31 backs some wagons towards the provender store.

Sunday, 9 September 2018

Charlton Provender store and signal box - some layout detailing

This weekend I had the rare commodity of some time to spend modelling!  The area of cobbles that has the provender store set into it, had been held up by the painting of a fence.  This fence was completed and glued down, acting as a barrier between part of the cobbled area and the rails.  The provender store was glued in place and the ballast was finished around the now derelict signal box.

The provender store now glued into place with some grass being added.  There is some more to do here, including thinning out of the grass (weeds!).

I have then spent the rest of the weekend glueing down bits of scatter grass and bushes - a combination of small bushes made from rubberised horsehair and also some commercial ones.  I also used dollops of PVA glue to glue in static grass around the base of buildings, and have started adding a little grass to the station.  The aim is to create a layout in the 1970s that has survived the axe, just, but is now a shadow of its former glory.  Hence there should be weeds growing everywhere! There is some hovering up and thinning out of the static grass that needs to take place, but it is starting to all shape up.  I am very pleased with how this area of the layout looks.

The after view, with some clumps of foliage added around the based of the buildings.


The before view with the provender store glued down.

So next steps are to sort the station out with custom nameboards and some station furniture to bring this to life a little and finish off the car park behind the station.  Hopefully I can get into those bits next weekend.

Some flowering weeds have been added to the siding.

The scribing of the cobbles was well worth the effort in this view.

Close up of the weeds at the base of the provender store.


View of the dereliction at the end of the station.  Note the weeds have taken hold even in the guttering of the signal box!


Sunday, 26 August 2018

Bachmann class 25 dcc sound - finished

So before I went away on my summer fieldwork I managed to finish off the detailing of my Bachmann class 25 dcc sound locomotive.  The locomotive was purchased about 7 years ago and came with factory installed sound.  Whist this was ok, it is a bit naff (in my opinion) compared to what is available through other sounds specialists.  Consequently, I sent the chip of to Howes to be reblown and set about detailing and weathering the locomotive.

The finished locomotive pottering around the Charlton layout.



As it looks out of the box.  The plastic shiny finish on the locomotive makes it look very toy like in my opinion.


Shunting some wagons at the station.  I think the locomotive tick over and move off  sounds are first class.

I fitted the accessory packs as per the instructions and fitted 3 link couplings, before dismantling the locomotive into the chassis block, body and the two bogies.  I masked off the chassis block except for the solebars, buffer beams and underframe, and then weathered the locomotive with a combination of Railmatch enamel paints.  As per normal I applied some tonal variations of faded blue and yellow over the body of the locomotive, before applying an all over body wash of frame dirt/weathered black roughly mixed.  Most of this was wiped away before final detailing with the airbrush.  The underframe and bogies had shades of weathered black, underframe dirt and sleeper grime sprayed over them.

The body shell during detailing with some of the spraying of the faded colours evident.  These are then blend in to overall finish with the airbrush.

More running around here!

Overall, I think this locomotive looks and sounds pretty good.  I did manage to finish off another class 25 a couple of years ago and ideally I will have these two to operate my layouts.  The problem is, the other class 25 is not sound fitted, so it is odd to run them together on the layout, with the sound effects really bringing another level of realism to the layout and a greater level of fun in operation.  I guess that means another sound chip is in order.  I currently has a class 122 DMU in the workshop being sound fitted and I am about to start a class 22 detailing and sound fitting, however, the layout does need some attention.  As for the rest of the weekend, I have an unlimited amount of modelling time, and I hope to add some further details to the layout.  More to follow here soon......




Friday, 20 July 2018

A class 25 and a summer interlude

Over the last couple of weeks I have managed to find some time to finish off the detailing of my Class 25 project.  This is the Bachmann DCC sound version, which had the chip reblown by Howes.  This has now been fully run in on the layout and I am delighted with the sounds, and pretty pleased with the overall result on the locomotive.  

Finished Class 25.

However, I have also managed to run out of time. I am heading away for the next 3 weeks, so in the mean time here are a couple of videos of the locomotive running around on the layout.  I will write a proper post about this when I return, when I will pick up blogging and modelling again later in August....until then enjoy your summers!

Running a rake of spoil wagons into Charlton, with flange squeals a plenty!

Running light out of Charlton station.

Sunday, 15 July 2018

Backscenes part deux!

Well after the last semi disaster with the backscene, I ordered an ID models photographic backscene, which has self adhesive backing, and some 0.3mm foamex sheets.  I choose an overcast day, with some blackening skies, typical Devon in my years of living there!  I ordered the foamex boards slightly too big for the backscene, but in 3ft lengths (same as the baseboards) and set to work applying the backscene to the boards.  I undertook this on my own in 3ft strips, and it was just about manageable as a 1 person job.  I started in one corner and slowly worked my way over the foamex board.  I managed to stick all of the sheets down in about 4 hours or so, and managed not to get any air bubbles on the finish.

Backscene cut into 3ft sections and attached to the foamex sheet.

The backscene and foamex trimmed to size.

When I was reasonably happy with how this was shaping up, I tore off the old backscene and removed the terraced houses and signal box, which had been glued down.  This was a awkward job to do, and in the process I wrecked the yard lamp.  However, I was determined to make a better effort this time, so quite a bit of the original scenic work was sacrificed.

Finished backscene looking towards Ilfracombe.

Looking towards Barnstaple.

I then cut the boards to the size of the backscene and started to glue them onto the layout using PVA glue.  In typical Murphy's law I was about 1 inch short of backscene, so I had to fudge one corner together, I will let you work out where!  However, after a good day of fiddling around, I have pretty good backscene.  Like all my modelling it is not quite perfect, but it is a vast improvement on the first attempt.  It does not dominate the scene, but it does provide some context to the model.  As this layout is a test run (although it does seem to be dragging on a bit!) I am pretty happy with the overall effect.  So now onwards with finally getting some buildings (re)glued down and some proper scenery detailing!!  I can also say with confidence that I have found a way of making a satisfactory backdrop for my layouts and this is a big step forward for me.  I will certainly use this method from now on.

Backscene visible behind a class 25 in the sidings, it does not dominate the picture, which I like.

View of the layout, showing the backscene.

Thursday, 5 July 2018

Backscene woes....and crinkles!

Well last week I felt I was making some real progress on the layout.  One  morning I was rummaging around a box in the railway room and found some old Gaugemaster backscenes I had long forgotten about.  I had originally decided on having a white painted backscene, but I had become increasingly unsatisfied with how this looked.  So I placed the Gaugemnaster backscene on the layout with blue tac to see how it looked.  It totally transformed the layout and it made me immediately decide to add a decent photographic backscene. The problem is I had already glued down the signal box and the house flush against the original painted backscene.  However, I purchased some Delux models Backscene glue and set to work to glue down the blue sky.

The Gaugemaster photographic backscene blue tacked down to see how it would look.

Same shot with just the painted white fibre board.  The difference between the two photographs is stark.

Well, the end result was a semi-disaster!!  Only semi - the sheets of the Gaugemaster photographic backscene I had must have come from separate batches.  Consequently, the colouring is slightly different between them and makes a terrible join behind the station!  The original painted wooden backscenee is a painted fibre board and the Delux models glue must have caused it to swell slightly.  Where I applied the glue there is swelling and crinkling on the photographic paper.  It is not too bad, but it is certainly noticeable.

Join between two of the sheets!

View back down the layout with the signal box removed.  The crinkles and join are far to distracting.

So two lessons learnt are 1) a better photographic backscene is needed, and 2) my skills in creating the backsence are limited!! I spent a bit of time thinking about it and came up with a plan.  I have ordered some 3mm foamex boards and an ID models self adhesive backscene.  The plan is to stick the photographic backscene to the foamex boards and then glue these onto the layout.  The only problem is I have to remove some of the detailing work already done, although this is not too onerous, but it means the signal box and terraced houses need to be moved.  The signal box came off easily enough.  However, I am summoning up the courage for the terraced houses.   

A few of the sort of effect I hope to be able to achieve.



Saturday, 30 June 2018

Western on a parcels service at Charlton June 1970

Last weekend I set up the layout to test out the new fiddle yard, and then ended up playing trains a little!  So captured on an overcast day in June 1976 a BR Blue western is captured running a short parcels into Charlton. This truncated SR branchline in North Devon somehow escaped being a victim of the Beaching Axe, although the branchline was effectively halved in the length.  The remaining half into Barnstaple gained a late reprieve, with a healthy level of goods and parcels traffic on the short branchline still in the 1970s.  More work has recently progressed on the layout and I am feeling happy with how it is all progressing.  It really helps to see it all working and it provides some impetus to get it finished!

Evenings parcels service runs into Charlton.


The Western uncoupled moves over the points to run around the train.


Western running around around the short loop.


Buffering back up, ready to head back to Barnstaple and then onto Exeter.


And back to Barnstaple the parcels service heads.

Sunday, 24 June 2018

Charlton layout - further progress

This week has seen some further progress on the layout.  As always there has been less time than I anticipated, but life always finds something to keep you busy!  Anyhow, a lot of those little jobs have been finished off.  The fiddle yard has been wired up so it is operational.  There is one more one more siding to add to the fiddle yard, but this is a relatively small job to solder this last one up.  The casing for the fiddle yard still needs to be finished, as this has only been partially completed.  However, the fiddle yard is now operation and can easily hold a 3 coach train plus locomotive in the longest siding, which will make operating the layout much easier.  The four roads in the fiddle yard will be able to hold a 3 coach plus locomotive formation, a 3 car DMU plus 1 car DMU, and two freight trains in the other two roads, a mixture of parcels, milk, china clay and of course an engineers working!

New fiddle yard, with three of the four sidings are now operational.

The fiddle yard can now easily hold a 3 coach train plus locomotive.

The tunnel entrance towards the fiddle yard has been glued down and the backscene partially painted.  The landscaping around the tunnel has been started using some paper mache, with the plaster bandage to be added over this today.  This new track has also been painted and ballasted, with the landscaping on this end of the layout starting today in earnest.

The tunnel entrance towards the fiddle yard is starting to take shape.

General view towards the fiddle yard.

The cobbled area around the provender store and old warehouse is taking a bit longer to finish.  I can't quite seem to get the balance right with the painting.  So attached are a couple of photos of how it looks at the moment.  An awful lot of mind numbing scribing went into this area, so I would like to get the balance of this right and really bring out the detail.  There are a couple more coats of paint to add to this today.   

Cobbled area, which still requires some more painting.

The cobbled area with a little bit of dry brushing across the bottom.  I am not happy with the appearance this at the moment.

Other jobs in progress are the scribing of a wall behind the signal box, which will eventually head towards the tunnel, and adding more static grass.  A lot of refining of this needs to happen around the trackwork and along the platforms.  The front of the layout needs some hedges and fences to be added as well.  However, there is a little bit of momentum with the layout detailing at the moment.  Maybe a June finish date was a little optimistic, however, it is all heading in the right direction.  

General shot of the layout as it currently is looking towards the fiddle yard.

The terminus end of the layout, showing the carpark and terraced houses.

View towards the terminus end during a test run.